Moolarben Water Treatment Facility
GDW Engineering was successful in being awarded a lump sum high and low voltage design and construct project at Moolarben Coal near Mudgee NSW.
The scope involved at a high level:
Two kilometer's of 11KV HV cable trenching, installation and backfill
Full electrical design drawings for the package
Engineering studies including arc flash, protection and earthing.
Procurement of MCC, Switch room, LCS’s, instruments and cable
High voltage terminations and QA
Low termination and QA
Installation and commissioning of schneider RM6 RMU’s and 11/415V Wilson transformers
Installation and commissioning of schneider RM6 RMU’s and 11/415V Wilson transformers