GDW Engineering was successful in being awarded a lump sum high and low voltage design and construct project at Moolarben Coal near Mudgee NSW. 

The scope involved at a high level:

  • Two kilometer's of 11KV HV cable trenching, installation and backfill
  • Full electrical design drawings for the package
  • Engineering studies including arc flash, protection and earthing.
  • Procurement of MCC, Switch room, LCS’s, instruments and cable
  • High voltage terminations and QA
  • Low termination and QA
  • Installation and commissioning of schneider RM6 RMU’s and 11/415V Wilson transformers
  • Installation and commissioning of schneider RM6 RMU’s and 11/415V Wilson transformers
  • Risk assessment facilitation
  • Lighting design and installation
  • Instrumentation calibrations
  • MDR and handover package
  • Operator training
Latest News & Projects
View All
Communications Tower

OC3 Comms Tower

Modus Micro-Brewery

Electrical construction of the Micro-Brewery and venue space.

Port of Newcastle

ESG Lighting Upgrade Project Stage 1

North Queensland Solar Farm

100MW Solar Farm

MACH ENERGY High Wall Dam
Procurement, Construction, Project & Construction Management, Turn-Key, Engineering, Renewables

Electrical Construction and Instrumentation Project