The works invloved design and construct services for the supply and installation of a comms tower control room with an automatic change over switch for generator supply, cable installation, cable ladder installation, assembly on the ground of a 50 metre radio tower and erection of the 50 metre radio tower.
Electrical Construction and Instrumentation Project
Coal Mine Project, Infrastructure, Prep and Handling Plant Electrical Support Services
Supply and installation as the E&IC contractor for the Kurri Kurri Lateral Pipeline Project feeding the new Hunter Power Project. Snowy Hydro has constructed a gas fired power station with a capacity of 750 Mega Watts. GDW were responsible for the Electrical and Instrumentation, to AS3000, 3008 and 60079 compliance, component of the pipeline that feeds the new power station.